Dedicated locality research platform

1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name A Wing Fire Exits --
Total Floors 17 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK,3 BHK
Flats Per Floor 7 Tower Layout
Tower Name B Wing Fire Exits --
Total Floors 17 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK,3 BHK
Flats Per Floor 7 Tower Layout
Tower Name C Wing Fire Exits --
Total Floors 42 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK,3 BHK
Flats Per Floor 7 Tower Layout
Wing Name Wing A Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Wing Name WING B Number of Podium 4
Number of Basements -- Number of Slabs of Superstructure 22
Number of Plinth 1 Number of Stilts 1
Wing Name Wing C Number of Podium 4
Number of Basements 2 Number of Slabs of Superstructure 49
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion N/A
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 95
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 95
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 95
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 95
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 70