Dedicated locality research platform

Builder Information
Project Name
Sheth Auris Ilaria Tower A
Locality
Malad (west)
Sub Locality
Kanchpada
Builder's Name
Sheth Creators (sheth Group),transcon
RERA Number(s)
P51800028533
Price Range
0.96 cr to 2.24 cr
Configuration Range
1 BHK , 2 BHK , 3 BHK
Construction Status
Under Construction


Master Layout
Project Layout Project Layout by RERA
Number of Towers 1 Total Building Count 1
Number of Units 487 Sanctioned Building Court 1
Type of Development Complex Proposed but not sanctioned buildings count --
Land Parcel 1,063.04 Sqmt Aggregate Area (in sqmts) of recreational open space --
Layout View Layout
Project Overview
Project Name
Auris Ilaria Tower A
Project Type
Others
Project Status
New Project
Proposed Date of Completion
2027-10-30
Revised Proposed Date of Completion
--
Number of Flats Sold
243
Built-up Area as per proposed FSI
(in sqmts)(Proposed but not sanctioned)

0
Total FSI
23314.23
Total Built-up Area as per approved FSI
23314.23

Amenities
Sports
  • Cricket Pitch
  • Multipurpose Court
  • Skating Rink
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Kids Pool
  • Gymnasium
  • Indoor Games Area
Leisure
  • Yoga Room / Zone
  • Spa
  • Library / Reading Room
  • Senior Citizen Zone
  • Sit-out Area
  • Reflexology Park
Business & Hospitality
  • Banquet Hall
  • Barbeque Pit
  • Clubhouse
  • Multipurpose Hall
Green Features
  • Green Zone
  • Landscaped Gardens
  • Water Storage
Security & Sanitation
  • Security System / CCTV
  • Security Staff
  • Earthquake Resistant Design
  • Auto Rescue Device (ARD)
Fire Safety
  • Sprinkler System
  • Fire rated doors / walls
  • Fire Hose
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Construction Status of Amenities - as per RERA
Amenities Available Percentage Detail
Internal Roads & Footpaths : No -- Na
Water Conservation, Rain Water Harvesting : Yes -- Rwh Only
Energy Management Yes -- As Per Moef Requirements
Fire Protection And Fire Safety Requirements : Yes -- As Per Cfo Requirements
Electrical Meter Room, Sub-station, Receiving Station : Yes -- Sub Station & Meter Room
E Reflexology Area : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Game Zone : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Open Amphitheater : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Outdoor Reading Corner : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Outdoor Toddlers Play : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Bbq Lawn : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Covered Seating Area : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Fitness Center : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Flower Pocket Garden : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Level Relaxing Pool Cabanas : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Meditation Studio : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Multipurpose Play Area : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Party Lawn : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Party Lawns : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Rock Climbing Wall : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Sculpture Garden : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Skating Rink : Yes -- To Be Handed Over To Apex At End Of Layout
E Deck Yoga Studio : Yes -- To Be Handed Over To Apex At End Of Layout
Entrance Lobby : Yes -- To Be Handed Over To Apex At End Of Layout
Kids Play Area (e-deck Level) : Yes -- To Be Handed Over To Apex At End Of Layout
Kids Pool (e-deck Level) : Yes -- To Be Handed Over To Apex At End Of Layout
Lounge And Seating Zone : Yes -- To Be Handed Over To Apex At End Of Layout
Multi Games Room (club House) Yes -- To Be Handed Over To Apex At End Of Layout
Pool Deck (e-deck Level) : Yes -- To Be Handed Over To Apex At End Of Layout
Reception & Lounge (club House) : Yes -- To Be Handed Over To Apex At End Of Layout
Sand Pit (e-deck Level) : Yes -- To Be Handed Over To Apex At End Of Layout
Senior Citizens Corner (e-deck Level) : Yes -- To Be Handed Over To Apex At End Of Layout
Swimming Pool (e-deck Level) : Yes -- To Be Handed Over To Apex At End Of Layout
Toddlers Play Area : Yes -- To Be Handed Over To Apex At End Of Layout
Tree Grove (e-deck Level) : Yes -- To Be Handed Over To Apex At End Of Layout
Aggregate Area Of Recreational Open Space : Yes -- Rg To Be Handed Over To Apex At End Of Layout
Open Parking : No -- Na
Water Supply : Yes -- Bmc Water Connection
Sewerage (chamber, Lines, Septic Tank , Stp) : Yes -- Stp
Storm Water Drains : Yes -- As Per Swd Layout
Landscaping & Tree Planting : Yes -- As Per Moef Requirements
Street Lighting : No -- Na
Community Buildings : No -- Na
Treatment And Disposal Of Sewage And Sullage Water : Yes -- Stp
Solid Waste Management And Disposal : Yes -- Owc
Construction Status - as per RERA
Parking Name Proposed Booked Work Done
Garages -- -- --
Covered Parking 519 391 --

Parking Available

Basement or over-ground with ramp parking

Car Parking Units

519

Power Backup

Complete Power Backup

© Propscience.com. All Rights Reserved.