Dedicated locality research platform

Builder Information
Project Name
Sheth Auris Serenity Tower 3
Locality
Malad (west)
Sub Locality
Kanchpada
Builder's Name
Sheth Creators (sheth Group)
RERA Number(s)
P51800001082
Price Range
2.55 cr to 4.41 cr
Configuration Range
2 BHK , 3 BHK
Construction Status
Sold Out


Master Layout
Project Layout Project Layout by RERA
Number of Towers 1 Total Building Count 1
Number of Units 332 Sanctioned Building Court 1
Type of Development Complex Proposed but not sanctioned buildings count --
Land Parcel 820.41 Sqmt Aggregate Area (in sqmts) of recreational open space --
Layout View Layout
Project Overview
Project Name
Auris Serenity Tower 3
Project Type
Others
Project Status
On-going Project
Proposed Date of Completion
2022-07-31
Revised Proposed Date of Completion
2024-12-30
Number of Flats Sold
302
Built-up Area as per proposed FSI
(in sqmts)(Proposed but not sanctioned)

0
Total FSI
35798.06
Total Built-up Area as per approved FSI
35798.06

Amenities
Sports
  • Multipurpose Court
  • Skating Rink
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Gymnasium
  • Outdoor Gym
  • Indoor Games Area
Leisure
  • Amphitheatre
  • Yoga Room / Zone
  • Senior Citizen Zone
  • Deck Area
  • Sit-out Area
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
Green Features
  • Waste Segregation
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
Business & Hospitality
  • Clubhouse
  • Multipurpose Hall
Fire Safety
  • Sprinkler System
  • Fire Hose
  • CNG / LPG Gas Leak Detector
Vertical Transportation
  • High Speed Elevators
  • Goods Lift
Construction Status of Amenities - as per RERA
Amenities Available Percentage Detail
Internal Roads & Footpaths : No -- Na
Water Conservation, Rain Water Harvesting : Yes 40 Rwh Only To Be Handed Over To Apex Body
Energy Management : Yes 10 As Per Moef Requirement To Be Handed Over To Apex
Fire Protection And Fire Safety Requirements : Yes 15 As Per Cfo To Be Handed Over To Apex Body
Electrical Meter Room, Sub-station, Receiving Station : Yes -- Receiving Station To Be Handed Over To Apex
Childrens Play Area : Yes -- To Be Handed Over To Apex Body
Club House With Gymnasium Steam And Sauna : Yes -- To Be Handed Over To Apex Body
Counter For Refreshment Bar : Yes -- To Be Handed Over To Apex Body
Grill Bar : Yes -- To Be Handed Over To Apex Body
Outdoor Pavillion : Yes -- To Be Handed Over To Apex Body
Podium Rcc Structure For Tower 3 : Yes -- To Be Handed Over To Apex Body
Pool Deck : Yes -- To Be Handed Over To Apex Body
Senior Citizen Corner : Yes -- To Be Handed Over To Apex Body
Swimming Pool : Yes -- To Be Handed Over To Apex Body
Aggregate Area Of Recreational Open Space : Yes -- Approx 4420.71sq.mtr Rg To Be Handed Over To Apex
Open Parking : No -- Na
Water Supply : Yes -- Bmc Water Connection To Be Handed Over To Apexbody
Sewerage (chamber, Lines, Septic Tank , Stp) : Yes -- Stp To Be Handed Over To Apex Body
Storm Water Drains : Yes -- Swd To Be Handed Over To Apex Body
Landscaping & Tree Planting : Yes -- Proposed On Edeck To Be Handed Over To Apex Body
Street Lighting : No -- Na
Community Buildings : No -- Na
Treatment And Disposal Of Sewage And Sullage Water : Yes -- As Per Moef Requirement To Be Handed Over To Apex
Solid Waste Management And Disposal : Yes -- Garbage Room To Be Handed Over To Apex Body
Construction Status - as per RERA
Parking Name Proposed Booked Work Done
Garages -- -- --
Covered Parking 609 412 20

Parking Available

Basement or over-ground with ramp parking

Car Parking Units

609

Power Backup

Complete Power Backup

© Propscience.com. All Rights Reserved.