Dedicated locality research platform

1st Habitable Floor

1st

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Project Under Pradhan Mantri Awaas Yojna (PMAY)

Tower Name Building No 17 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 18 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 19 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 20 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 8 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 9 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 10 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 14 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 15 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Tower Name Building No 16 Fire Exits 3
Total Floors 24 Refuge Areas 4
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 15 Tower Layout
Wing Name Building No 17 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 18 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 19 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 20 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 8 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 9 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 10 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 14 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 15 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Wing Name Building No 16 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2023
Possession Availability as per RERA
Proposed Date of Completion 30-12-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 35
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises, Electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.