Dedicated locality research platform

1st Habitable Floor

1st

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Spacious & Luxury

Tower Name Sheetal Deep Wing A Fire Exits 2
Total Floors 16 Refuge Areas 4
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Sheetal Deep Wing B Fire Exits 2
Total Floors 16 Refuge Areas 4
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout
Tower Name Sheetal Deep Wing C Fire Exits 2
Total Floors 16 Refuge Areas 4
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout
Tower Name Sheetal Deep Wing D Fire Exits 2
Total Floors 16 Refuge Areas 4
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout
Tower Name Sheetal Deep Wing E Fire Exits 2
Total Floors 16 Refuge Areas 4
Number of Elevators 2 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout
Wing Name Sheetal Deep Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 16
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2018
Possession Availability as per RERA
Proposed Date of Completion 31-12-2018
Revised Proposed Date of Completion 31-12-2018
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 25
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 70
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 50
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --