Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
Water Body / City Skyline
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name Phase 2 Fire Exits 6
Total Floors 21 Refuge Areas 1
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Sanghvi Heights Phase 2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth -- Number of Stilts --
Possession Availability
Possession Date 31-12-2023
Possession Availability as per RERA
Proposed Date of Completion 30-06-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 87
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 65
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 61
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 87
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 68
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 71
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.