1st Habitable Floor

8th Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Greater than 10 feet

Project Theme

--

Tower Name World View Fire Exits 3
Total Floors 76 Refuge Areas 6
Number of Elevators 8 Configurations Present 3 BHK,4 BHK
Flats Per Floor 5 Tower Layout View Layout
Wing Name Trinity Number of Podium 6
Number of Basements 2 Number of Slabs of Superstructure 77
Number of Plinth 1 Number of Stilts --
Wing Name World One - Tier III Above 80th floor Number of Podium 5
Number of Basements 2 Number of Slabs of Superstructure 35
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30/06/2021
Possession Availability as per RERA
Proposed Date of Completion 30-06-2021
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 62
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 85
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 52
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 50