1st Habitable Floor

3 rd floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Glass fascade buildings

Tower Name 1 ICC Fire Exits 2
Total Floors 59 Refuge Areas --
Number of Elevators 12 Configurations Present 3 BHK,4 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name 2 ICC Fire Exits 2
Total Floors 65 Refuge Areas --
Number of Elevators 16 Configurations Present 3 BHK,4 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name ONE ICC Number of Podium 1
Number of Basements 3 Number of Slabs of Superstructure 60
Number of Plinth 1 Number of Stilts 1
Wing Name TWO ICC Number of Podium 1
Number of Basements 3 Number of Slabs of Superstructure 68
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/08/2019
Possession Availability as per RERA
Proposed Date of Completion 31-08-2018
Revised Proposed Date of Completion 31-08-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plith 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats / Premises, Doors And Windows To Each Of The Flat / Premises 100
1 Sanitary Fittings Within The Flat / Premises, Electrical Fittings Within The Premises 100
1 Staircases, Lift Wells & Lobbies On Each Floor Level, Connecting Staircases & Lifts, Overhead And Underground Water Tanks 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building / Wing 98
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings & Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment / Crz 100