Dedicated locality research platform

1st Habitable Floor

7th Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name Elysian Tower B Fire Exits 1
Total Floors 72 Refuge Areas 4
Number of Elevators 6 Configurations Present 3 BHK,4 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name Elysian Tower B Number of Podium 5
Number of Basements 2 Number of Slabs of Superstructure 70
Number of Plinth 1 Number of Stilts 2
Possession Availability
Possession Date 30-06-2027
Possession Availability as per RERA
Proposed Date of Completion 30-06-2027
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 20
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 7
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.