Tower Name Rustomjee Seasons Wing D Fire Exits 2
Total Floors 22 Refuge Areas 2
Number of Elevators 3 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name PHASE- D1 Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 25
Number of Plinth 1 Number of Stilts --
Wing Name PHASE D2 Number of Podium --
Number of Basements 3 Number of Slabs of Superstructure 25
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30-12-2023
Possession Availability as per RERA
Proposed Date of Completion 30-12-2025
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 79
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 31
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 4
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 1
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 22