Dedicated locality research platform

1st Habitable Floor

1st

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name Wing A Fire Exits 4
Total Floors 40 Refuge Areas 4
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing B Fire Exits 4
Total Floors 40 Refuge Areas 4
Number of Elevators 4 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Wing C Fire Exits 4
Total Floors 40 Refuge Areas 4
Number of Elevators 3 Configurations Present 3 BHK,4 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Wing A Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 40
Number of Plinth 1 Number of Stilts 1
Wing Name Wing B Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 40
Number of Plinth 1 Number of Stilts 1
Wing Name Wing C Number of Podium 2
Number of Basements 2 Number of Slabs of Superstructure 40
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-12-2022
Revised Proposed Date of Completion 30-12-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 69
1 X Number Of Podiums 81
1 Stilt Floor 80
1 X Number Of Slabs Of Super Structure 68
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 44
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 52
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 18
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 4
View More
View Less
Amenities
Sports
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Gymnasium
  • Indoor Games Area
Leisure
  • Amphitheatre
  • Steam Room
  • Sauna
  • Deck Area
  • Sit-out Area
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • Video Door Phone
  • Earthquake Resistant Design
Business & Hospitality
  • Barbeque Pit
  • Party Lawn
  • Sky Lounge / Bar
  • Clubhouse
  • Multipurpose Hall
Green Features
  • Water Bodies / Koi Ponds
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Fire Safety
  • Sprinkler System
Vertical Transportation
  • High Speed Elevators
Sports
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Gymnasium
  • Indoor Games Area
Leisure
  • Amphitheatre
  • Steam Room
  • Sauna
  • Deck Area
  • Sit-out Area
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • Video Door Phone
  • Earthquake Resistant Design
Business & Hospitality
  • Barbeque Pit
  • Party Lawn
  • Sky Lounge / Bar
  • Clubhouse
  • Multipurpose Hall
Green Features
  • Water Bodies / Koi Ponds
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Fire Safety
  • Sprinkler System
Vertical Transportation
  • High Speed Elevators
© Propscience.com. All Rights Reserved.