Dedicated locality research platform

1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Gagangiri Elanza Fire Exits --
Total Floors 40 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Wing Name Gagangiri Elanza Number of Podium 7
Number of Basements -- Number of Slabs of Superstructure 34
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/03/2021
Possession Availability as per RERA
Proposed Date of Completion 30-09-2021
Revised Proposed Date of Completion 01-01-1970
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 50
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 65
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 55
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 60
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 10
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 15
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.