1st Habitable Floor

1 st floor

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Park Reach Fire Exits --
Total Floors 23 Refuge Areas 1
Number of Elevators 2 Configurations Present 3 BHK
Flats Per Floor 1 Tower Layout
Tower Name Park Reach Fire Exits 1
Total Floors 23 Refuge Areas 3
Number of Elevators 2 Configurations Present Duplex
Flats Per Floor 1 Tower Layout
Wing Name Park Reach Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 21
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 29/12/2019
Possession Availability as per RERA
Proposed Date of Completion 29-12-2019
Revised Proposed Date of Completion 29-12-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 73
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 50
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 75
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --