Dedicated locality research platform

1st Habitable Floor

Ground Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name Tower-10 Fire Exits 2
Total Floors 54 Refuge Areas --
Number of Elevators 4 Configurations Present 1.5 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower-11 Fire Exits 2
Total Floors 54 Refuge Areas --
Number of Elevators 4 Configurations Present 1.5 BHK,1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Tower-9 Fire Exits 3
Total Floors 48 Refuge Areas --
Number of Elevators 4 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout
Wing Name Tower-9 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 52
Number of Plinth 1 Number of Stilts 1
Wing Name Tower -10 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 44
Number of Plinth 1 Number of Stilts 1
Wing Name Tower-11 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 58
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-01-2023
Possession Availability as per RERA
Proposed Date of Completion 30-11-2021
Revised Proposed Date of Completion 30-06-2026
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 18
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 5
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 7
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --