1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Gated Community

Tower Name Wing A Fire Exits 2
Total Floors 21 Refuge Areas 4
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Wing B Fire Exits 2
Total Floors 21 Refuge Areas 4
Number of Elevators 3 Configurations Present 1 BHK,2 BHK,2.5 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Wing C Fire Exits 2
Total Floors 21 Refuge Areas 4
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Wing D Fire Exits 2
Total Floors 21 Refuge Areas 4
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 7 Tower Layout View Layout
Wing Name Wing A Number of Podium 1
Number of Basements 2 Number of Slabs of Superstructure 21
Number of Plinth 1 Number of Stilts 1
Wing Name WING B Number of Podium 1
Number of Basements 2 Number of Slabs of Superstructure 21
Number of Plinth 1 Number of Stilts 1
Wing Name WING C Number of Podium 1
Number of Basements 2 Number of Slabs of Superstructure 21
Number of Plinth 1 Number of Stilts 1
Wing Name WING D Number of Podium 1
Number of Basements 2 Number of Slabs of Superstructure 21
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30/06/2022
Possession Availability as per RERA
Proposed Date of Completion 30-09-2018
Revised Proposed Date of Completion 30-12-2022
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 94
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 85
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 65
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --