Dedicated locality research platform

1st Habitable Floor

9th Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name Wing A Fire Exits --
Total Floors 42 Refuge Areas 4
Number of Elevators 5 Configurations Present 2 BHK,3 BHK,4 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing B Fire Exits --
Total Floors 42 Refuge Areas 4
Number of Elevators 5 Configurations Present 2 BHK,3 BHK,4 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name A wing Number of Podium 6
Number of Basements 1 Number of Slabs of Superstructure 42
Number of Plinth 1 Number of Stilts 1
Wing Name B wing Number of Podium 6
Number of Basements 1 Number of Slabs of Superstructure 42
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2023
Possession Availability as per RERA
Proposed Date of Completion 30-09-2018
Revised Proposed Date of Completion 30-06-2024
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 90
1 X Number Of Podiums 80
1 Stilt Floor 80
1 X Number Of Slabs Of Super Structure 10
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 15
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --