Dedicated locality research platform

1st Habitable Floor

1st

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Palatial Living

Tower Name The Palace Tower B Fire Exits 4
Total Floors 40 Refuge Areas 7
Number of Elevators 7 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 15 Tower Layout
Wing Name The Palace Tower B Number of Podium 9
Number of Basements -- Number of Slabs of Superstructure 40
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2028
Possession Availability as per RERA
Proposed Date of Completion 31-12-2028
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Sports
  • Badminton Court
  • Cricket Pitch
  • Multipurpose Court
  • Squash Court
  • Tennis Court
  • Swimming Pool
  • Jogging Track
  • Gymnasium
Leisure
  • Amphitheatre
  • Mini Theatre
  • Steam Room
  • Spa
  • Library / Reading Room
  • Senior Citizen Zone
Business & Hospitality
  • Banquet Hall
  • Clubhouse
Green Features
  • Herb Garden
  • Green Zone
  • Rain Water Harvesting
  • Water Storage
Security & Sanitation
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
  • Earthquake Resistant Design
  • Auto Rescue Device (ARD)
Fire Safety
  • Sprinkler System
  • Fire rated doors / walls
  • Fire Hose
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
© Propscience.com. All Rights Reserved.