Dedicated locality research platform

1st Habitable Floor

1st

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Strategically located

Tower Name Wing C Fire Exits 1
Total Floors 7 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name Wing D Fire Exits 1
Total Floors 7 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name BAPU NAGAR C WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name BAPU NAGAR D WING Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-07-2024
Possession Availability as per RERA
Proposed Date of Completion 31-07-2025
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 80
1 Number Of Podiums --
1 Stilt Floor 50
1 Number Of Slabs Of Super Structure 50
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Rain Water Harvesting
  • Water Storage
Fire Safety
  • Fire cylinders
Vertical Transportation
  • High Speed Elevators
Security & Sanitation
  • Maintenance Staff
  • Security System / CCTV
  • Security Staff
  • Earthquake Resistant Design
Green Features
  • Rain Water Harvesting
  • Water Storage
Fire Safety
  • Fire cylinders
© Propscience.com. All Rights Reserved.