Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Market & Temples Are Nearby

Tower Name Sneham Fire Exits 1
Total Floors 12 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK
Flats Per Floor 3 Tower Layout View Layout
Wing Name Sneham Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 12
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 29-02-2024
Possession Availability as per RERA
Proposed Date of Completion 29-08-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Sports
  • Kids Play Area
  • Kids Zone
  • Gymnasium
Leisure
  • Deck Area
  • Sit-out Area
Green Features
  • Green Zone
  • Rain Water Harvesting
  • Water Storage
Business & Hospitality
  • Clubhouse
© Propscience.com. All Rights Reserved.