Dedicated locality research platform

1st Habitable Floor

4th

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Exclusive 1, 2 BHK residential apartments

Tower Name Alpine Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Begonia Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Blossom Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Bluebell Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Primrose Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Rosalyn Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Rosemary Fire Exits 2
Total Floors 25 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Alpine Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 27
Number of Plinth 1 Number of Stilts 1
Wing Name Begonia Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Blossom Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Bluebell Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Primrose Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Rosalyn Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Rosemary Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-03-2023
Possession Availability as per RERA
Proposed Date of Completion 30-03-2024
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 84
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 1o
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 80
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.