Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Pride Palms ensures fresh green living while keeping you clo ...

Tower Name A2 Fire Exits 2
Total Floors 31 Refuge Areas 3
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name A2 Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 31
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2024
Possession Availability as per RERA
Proposed Date of Completion 31-12-2019
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 97
1 Stilt Floor 97
1 X Number Of Slabs Of Super Structure 93
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 75
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 32
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 88
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 24
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 74
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.