Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Gated Community

Tower Name Rashmi Swastik Nagar - Wing 1 - Redevlopment Fire Exits 1
Total Floors 11 Refuge Areas --
Number of Elevators 1 Configurations Present Studio,1 BHK
Flats Per Floor 7 Tower Layout
Wing Name Rashmi Swastik Nagar - Wing 1 - Redevolopment Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 11
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30-01-2021
Possession Availability as per RERA
Proposed Date of Completion 23-01-2020
Revised Proposed Date of Completion 30-07-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 70
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 70
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 50
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks 50
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 70
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 50
View More
View Less
Amenities
Sports
  • Kids Play Area
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
Leisure
  • Pet Friendly
Business & Hospitality
  • ATM / Bank Attached
  • Restaurant / Cafe
Green Features
  • Water Storage
© Propscience.com. All Rights Reserved.