Dedicated locality research platform

1st Habitable Floor

1st

Views
--
Floor to Ceiling Height

--

Project Theme

Good air circulation in flat. Proper light and aeration with ...

Tower Name Tower 1 Fire Exits 2
Total Floors 28 Refuge Areas 2
Number of Elevators 4 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Tower 2 Fire Exits 2
Total Floors 28 Refuge Areas 2
Number of Elevators 4 Configurations Present 3.5 BHK,2.5 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Tower 1 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Tower 2 Number of Podium 1
Number of Basements 1 Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts 1
Wing Name Rental Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 01/03/2019
Possession Availability as per RERA
Proposed Date of Completion 01-06-2018
Revised Proposed Date of Completion 31-01-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 95
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 80
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 25
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 90
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 80
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 25
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.