1st Habitable Floor

4th

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Big residential township

Tower Name A5 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name B3 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 6 Tower Layout View Layout
Tower Name C5 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout
Tower Name A6 Fire Exits 2
Total Floors 23 Refuge Areas --
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout
Wing Name A5 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 31
Number of Plinth 1 Number of Stilts 1
Wing Name B3 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 31
Number of Plinth 1 Number of Stilts 1
Wing Name C5 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 31
Number of Plinth 1 Number of Stilts 1
Wing Name A6 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 32
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-12-2022
Revised Proposed Date of Completion 30-12-2023
Sr. No Task/Activity % Work Done
1 Excavation 50
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less