Dedicated locality research platform

Investor's Tools

  Project Summary   Back

Propscore Rating

Place

Connectivity

Infrastructure

Local Environment

Land & Approvals

Project

People

Buildings

Amenities

Area & Layout

Interiors

Commercials

02 Jun 22

The Construction work for the project is yet to start, Excavation for the tower 9 is done and the excavation for other towers are underway. The project is adjacent to Godrej Nirvaan of which the Construction is visible.

01 Jan 70

Plinth Work In Progress Possession in 2024. Minimum passage area ensures maximum area is utilized under rooms, kitchen and toilet. Full height windows provided for maximization of views and sun light in living room & bedroom.

Write a review for this project
Quarter Ending Number of Transactions Average Rate per Sqft
Jan-March 2022 3 INR 10857.10
Oct-Dec 2021 9 INR 10416.54
July-Sept 2021 9 INR 9951.58
April-June 2021 6 INR 9946.85
Jan-March 2021 6 INR 9847.52

WE ARE HERE TO HELP YOU!

WHY DOWNLOAD A PROP-REPORT?

  • An executive summary of the project.
  • Prepared in an easy to read format.
  • Download and print as and when required.
  • Provides you with all the information and details of the project.
  • Helps you to make an informed and intelligent purchase decision.
  • Once you downloaded it feel proud to be a privileged member of Propscience.com.
Comming Soon
Comming Soon
© Propscience.com. All Rights Reserved.