Dedicated locality research platform

Builder Information
Project Name
Sheth Auris Serenity Tower 2
Locality
Malad (west)
Sub Locality
Kanchpada
Builder's Name
Sheth Creators (sheth Group),transcon
RERA Number(s)
P51800001413
Price Range
--
Configuration Range
2 BHK , 3 BHK , 4 BHK
Construction Status
Sold Out


Master Layout
Project Layout Project Layout by RERA
Number of Towers 1 Total Building Count 1
Number of Units 340 Sanctioned Building Court 1
Type of Development Complex Proposed but not sanctioned buildings count --
Land Parcel 923.13 Sqmt Aggregate Area (in sqmts) of recreational open space --
Layout View Layout
Project Overview
Project Name
Auris Serenity Tower 2
Project Type
Residential
Project Status
On-going Project
Proposed Date of Completion
2021-07-31
Revised Proposed Date of Completion
2023-06-30
Number of Flats Sold
340
Built-up Area as per proposed FSI
(in sqmts)(Proposed but not sanctioned)

0
Total FSI
39793.11
Total Built-up Area as per approved FSI
39793.11

Amenities
Sports
  • Multipurpose Court
  • Skating Rink
  • Swimming Pool
  • Jogging Track
  • Kids Play Area
  • Kids Zone
  • Gymnasium
  • Outdoor Gym
  • Indoor Games Area
Leisure
  • Amphitheatre
  • Yoga Room / Zone
  • Senior Citizen Zone
  • Deck Area
  • Sit-out Area
Security & Sanitation
  • Society Office
  • Security System / CCTV
  • Intercom Facility
  • Security Staff
Green Features
  • Waste Segregation
  • Green Zone
  • Rain Water Harvesting
  • Landscaped Gardens
Business & Hospitality
  • Clubhouse
  • Multipurpose Hall
Fire Safety
  • Sprinkler System
  • Fire Hose
  • CNG / LPG Gas Leak Detector
Vertical Transportation
  • High Speed Elevators
  • Goods Lift
Construction Status of Amenities - as per RERA
Amenities Available Percentage Detail
Internal Roads & Footpaths : No -- Na
Water Conservation, Rain Water Harvesting : Yes 15 Rwh Only To Be Handed Over To Apex Body
Energy Management : Yes 15 As Per Moef Requirement To Be Handed Over To Apex
Fire Protection And Fire Safety Requirements : Yes 35 As Per Cfo To Be Handed Over To
Electrical Meter Room, Sub-station, Receiving Station : Yes 10 Receiving Station To Be Handed Over To Apex
Childrens Play Area : Yes -- To Be Handed Over To Apex Body
Club House With Gymnasium Steam And Sauna : Yes -- To Be Handed Over To Apex Body
Counter For Refreshment Bar : Yes -- To Be Handed Over To Apex Body
Grill Bar : Yes -- To Be Handed Over To Apex Body
Outdoor Pavillion : Yes -- To Be Handed Over To Apex Body
Podium Rcc Structure For Tower 2 : Yes -- To Be Handed Over To Apex Body
Pool Deck : Yes -- To Be Handed Over To Apex Body
Senior Citizen Corner : Yes -- To Be Handed Over To Apex Body
Swimming Pool : Yes -- To Be Handed Over To Apex Body
Aggregate Area Of Recreational Open Space : Yes -- Approx 4420.71sq.mtr Rg To Be Handed Over To Apex
Open Parking : No -- Na
Water Supply : Yes -- Bmc Water Connection To Be Handed Over To Apexbody
Sewerage (chamber, Lines, Septic Tank , Stp) : Yes 50 Stp To Be Handed Over To Apex Body
Storm Water Drains : Yes 10 Swd To Be Handed Over To Apex Body
Landscaping & Tree Planting : Yes -- Proposed On Edeck To Be Handed Over To Apex Body
Street Lighting : No -- Na
Community Buildings : No -- Na
Treatment And Disposal Of Sewage And Sullage Water : Yes 50 As Per Moef Requirement To Be Handed Over To Apex
Solid Waste Management And Disposal : Yes -- Garbage Room To Be Handed Over To Apex Body
Construction Status - as per RERA
Parking Name Proposed Booked Work Done
Garages -- -- --
Covered Parking 558 522 40

Parking Available

Basement or over-ground with ramp parking

Car Parking Units

558

Power Backup

Complete Power Backup

© Propscience.com. All Rights Reserved.