Project
Project Name Rustomjee Urbania Azziano Wing K |
Locality Uthalsar |
Sub Locality Majiwada |
Builder's Name Kapstone Constructions Private Limited |
RERA Number(s) P51700013649 |
Price Range 1.31 cr to 1.4 cr |
Configuration Range 2 BHK |
Construction Status Ready to Move |
Project Layout | Project Layout by RERA | ||
Number of Towers | 1 | Total Building Count | 1 |
Number of Units | 273 | Sanctioned Building Court | 1 |
Type of Development | Complex | Proposed but not sanctioned buildings count | -- |
Land Parcel | 0.16 Acre | Aggregate Area (in sqmts) of recreational open space | -- |
Layout | View Layout |
Project Name Rustomjee Azziano Wing K |
Project Type Residential |
Project Status New Project |
Proposed Date of Completion 2022-09-30 |
Revised Proposed Date of Completion -- |
Number of Flats Sold 121 |
Built-up Area as per proposed FSI (in sqmts)(Proposed but not sanctioned) 0 |
Total FSI 16247.02 |
Total Built-up Area as per approved FSI 16247.02 |
Sports |
Leisure |
Business & Hospitality |
Security & Sanitation |
Green Features |
Fire Safety |
Vertical Transportation |
Amenities | Available | Percentage | Detail |
---|---|---|---|
Internal Roads & Footpaths | Yes | 50 | Fire Tender & Other Drive Ways |
Water Conservation, Rain Water Harvesting | Yes | -- | Rwh Drains And Chambers Wip |
Energy Management | Yes | -- | Solar Panels At Terrace Level As Per Moef |
Fire Protection And Fire Safety Requirements | Yes | -- | Fire Fighting Works At Podium And Ground Level Wip |
Electrical Meter Room, Sub-station, Receiving Station | Yes | -- | Yet To Commence |
Alfresco Dining Out Door Dining Area For Informal Get Together. | Yes | -- | Will Be Provided With Wing I |
Box Cricket / Basket Ball Court 14.5 X15.5 M Designed For Multisport Activities. | Yes | -- | Will Be Delivered With Wing K |
Business Center / Meeting Rooms (2 Nos) | Yes | -- | Will Be Delivered With Wing K |
Café Airconditioned Cafe For 20 To 25 Seating , With A Service Pantry. | Yes | 30 | Will Be Provided With Wing H |
Changing Rooms With Showers | Yes | 50 | Will Be Provided With Wing H |
Cooling Mist Pod Located Near Ramp | Yes | -- | Will Be Provided With Wing I |
Dry Fountain Fun Activity | Yes | -- | Will Be Provided With Wing I |
Festive Plaza And Multiputpose Play Ground | Yes | 100 | Common For The Whole Project |
Gymnasium Air Conditioned Work Out Area Adm 222 Sq. Mtr. With Cardio & Strength Equipments | Yes | 30 | Will Be Provided With Wing F / G |
Indoor Games Zone Airconditioned Space For Pool, Table Tennis And Board Games Like Chess & Carro | Yes | 30 | Will Be Provided With Wing H |
Kid's Play Area Semi-open Kids Play Area | Yes | -- | Will Be Provided With Wing J |
Kid's Pool Shallow Pool 600mm Depth | Yes | 80 | Will Be Provided With Wing I |
Leons World Enclosed Kids Activity Area | Yes | -- | Will Be Provided With Wing J |
Library / Reading Room Airconditioned Space Provided For Reading & Interaction . | Yes | -- | Will Be Provided With Wing K |
Mini Golf Semiopen Golf Practice Area In Buiding Foot Prin | Yes | 30 | Will Be Provided With Wing F |
Mini Theatre Air Conditioned Preview Theatre For 12-16 Seating. | Yes | -- | Will Be Provided With Wing I |
Party Hall Capacity 100-120 Pax, A.c. , With Service Pantry Facility Light & Sound Arrangement | Yes | -- | Will Be Provided With Wing I / J |
Party Spill Out Area Capacity 100 To 120 Pax Open To Sky | Yes | -- | Will Be Provided With Wing I |
Prefunction Area Guests Welcome Lounge For Party Hall | Yes | -- | Will Be Provided With Wing I / J |
Resting Cabanas Outdoor Furniture For Resting & Relaxation | Yes | -- | Will Be Provided With Wing I |
Senior Citizens Relaxation Area Semi Covered With Resting Benches / Recliners | Yes | -- | Will Be Provided With Wing I |
Spa Air Conditioned Spa With Two Treatment Rooms And Attached Restroom. | Yes | 25 | Will Be Provided With Wing H |
Swimming Pool 49 X 11.3 M X 1.2 M Deep | Yes | 85 | Will Be Provided With Wing I |
Tennis Court | Yes | -- | Will Be Delivered With Wing K |
Aggregate Area Of Recreational Open Space | Yes | -- | Na |
Open Parking | No | -- | Na |
Water Supply | Yes | 60 | Connection From Esr To Ug Tank |
Sewerage (chamber, Lines, Septic Tank , Stp) | Yes | 33 | Stp Rcc Work Commenced |
Storm Water Drains | Yes | 50 | Rcc Work Of Swd Cover Fixing Wip |
Landscaping & Tree Planting | Yes | -- | Yet To Commence |
Street Lighting | Yes | -- | Yet To Commence |
Community Buildings | No | -- | Na |
Treatment And Disposal Of Sewage And Sullage Water | Yes | 33 | Stp Work In Progress |
Solid Waste Management And Disposal | Yes | -- | Owc Unit To Be Installed |
Parking Name | Proposed | Booked | Work Done |
---|---|---|---|
Garages | -- | -- | -- |
Covered Parking | 300 | -- | -- |
Parking Available
Basement and over-ground with stack parking
Car Parking Units
300
Power Backup
Not Mentioned