1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Wing A Fire Exits --
Total Floors 8 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,2 BHK,3 BHK,Studio
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing B Fire Exits --
Total Floors 8 Refuge Areas --
Number of Elevators 1 Configurations Present 1 BHK,2 BHK,3 BHK,Studio
Flats Per Floor 4 Tower Layout
Wing Name A & B Wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-12-2018
Revised Proposed Date of Completion 31-12-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 80
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 80
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 80
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 80
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 50
View More
View Less