Tower Name Paramount Heights Fire Exits --
Total Floors 19 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 5 Tower Layout
Wing Name Bldg No 1 Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 19
Number of Plinth 1 Number of Stilts 1
Wing Name Bldg No 2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 30-05-2017
Revised Proposed Date of Completion 31-03-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 50
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 73
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 45
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 10
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 50
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 30
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --