1st Habitable Floor

1st Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

Gated Society

Tower Name SunShine Green Park Phase 2 Fire Exits 2
Total Floors 5 Refuge Areas --
Number of Elevators 2 Configurations Present Studio,1 BHK,2 BHK
Flats Per Floor 2 Tower Layout
Wing Name SUNSHINE GREEN PARK BLDG No 06 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name SUNSHINE GREEN PARK BLDG No 07 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 5
Number of Plinth 1 Number of Stilts 1
Wing Name PROPOSED Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 4
Number of Plinth 1 Number of Stilts 1
Wing Name Proposed building Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 2
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-03-2019
Possession Availability as per RERA
Proposed Date of Completion 31-07-2018
Revised Proposed Date of Completion 31-03-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 85
1 X Number Of Slabs Of Super Structure 78
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 60
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 40
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 40
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 40
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 50