1st Habitable Floor

1st Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name Coral Fire Exits 1
Total Floors 25 Refuge Areas 1
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Emerald Fire Exits 1
Total Floors 25 Refuge Areas 1
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Jade Fire Exits 1
Total Floors 25 Refuge Areas 1
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Ivory Fire Exits 1
Total Floors 25 Refuge Areas 1
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Opal Fire Exits 1
Total Floors 25 Refuge Areas 1
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Ruby Fire Exits 1
Total Floors 25 Refuge Areas 1
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Tower 2 Type A CORAL Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Tower 2 Type B EMERALD Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Tower 2 Type C JADE Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Tower 2 Type D IVORY Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Tower 3 Type A OPAL Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Tower 3 Type B RUBY Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-12-2028
Possession Availability as per RERA
Proposed Date of Completion 30-12-2028
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less