1st Habitable Floor

8 th floor

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Nirvana Part 1 Fire Exits 2
Total Floors 54 Refuge Areas 4
Number of Elevators 6 Configurations Present 2 BHK,3 BHK
Flats Per Floor 5 Tower Layout
Wing Name Nirvana Part I Number of Podium 6
Number of Basements 01 Number of Slabs of Superstructure 58
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2022
Possession Availability as per RERA
Proposed Date of Completion 31-12-2021
Revised Proposed Date of Completion 31-12-2022
Sr. No Task/Activity % Work Done
1 Excavation 80
1 X Number Of Basement(s) And Plinth 80
1 X Number Of Podiums 100
1 Stilt Floor 30
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --