Dedicated locality research platform

1st Habitable Floor

-

Views
--
Floor to Ceiling Height

--

Project Theme

-

Tower Name Preksha Fire Exits --
Total Floors 8 Refuge Areas --
Number of Elevators -- Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor -- Tower Layout
Wing Name Preksha Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 10
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-09-2020
Possession Availability as per RERA
Proposed Date of Completion 30-09-2020
Revised Proposed Date of Completion 30-09-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 22
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.