1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Tower A Fire Exits --
Total Floors 70 Refuge Areas --
Number of Elevators 5 Configurations Present 2 BHK,3 BHK,4 BHK
Flats Per Floor 4 Tower Layout
Wing Name EAST TOWER Number of Podium 5
Number of Basements 2 Number of Slabs of Superstructure 60
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30/06/2021
Possession Availability as per RERA
Proposed Date of Completion 30-06-2021
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 90
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 78
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 2
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 70
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 54
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 23