Dedicated locality research platform

1st Habitable Floor

Residential

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name T5 Fire Exits --
Total Floors 58 Refuge Areas --
Number of Elevators 8 Configurations Present 3 BHK
Flats Per Floor 6 Tower Layout View Layout
Wing Name Crescent Bay - T5 Number of Podium 7
Number of Basements -- Number of Slabs of Superstructure 57
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-03-2018
Revised Proposed Date of Completion 31-08-2018
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 98
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 92
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 90
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 89
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.