Dedicated locality research platform

1st Habitable Floor

-

Views
--
Floor to Ceiling Height

--

Project Theme

-

Tower Name 71 RAINTREE Fire Exits --
Total Floors 16 Refuge Areas --
Number of Elevators -- Configurations Present 1 BHK,2 BHK,3 BHK,Duplex
Flats Per Floor -- Tower Layout
Wing Name 71 RAINTREE Number of Podium --
Number of Basements 1 Number of Slabs of Superstructure 16
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31-03-2018
Possession Availability as per RERA
Proposed Date of Completion 31-03-2018
Revised Proposed Date of Completion 31-08-2018
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 90
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 50
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 90
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 75
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 50
View More
View Less
Amenities
Sports
  • Jogging Track
  • Kids Play Area
Green Features
  • Rain Water Harvesting
  • Landscaped Gardens
  • Water Storage
Security & Sanitation
  • Security System / CCTV
© Propscience.com. All Rights Reserved.