Dedicated locality research platform

1st Habitable Floor

2nd Floor

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name MS Gateway Wing A Fire Exits 1
Total Floors 8 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name MS Gateway Wing B Fire Exits 1
Total Floors 8 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 3 Tower Layout
Tower Name MS Gateway Wing C Fire Exits 1
Total Floors 8 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Wing Name A WING Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name B WING Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Wing Name C WING Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 8
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-09-2027
Possession Availability as per RERA
Proposed Date of Completion 30-09-2027
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.