test

Dedicated locality research platform

test
1st Habitable Floor

1st Floor

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name A Wing Fire Exits 1
Total Floors 33 Refuge Areas 3
Number of Elevators 4 Configurations Present 1 BHK,2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name B Wing Fire Exits 1
Total Floors 33 Refuge Areas 3
Number of Elevators 4 Configurations Present 1 BHK,2 BHK
Flats Per Floor 7 Tower Layout View Layout
Tower Name C Wing Fire Exits 1
Total Floors 33 Refuge Areas 1
Number of Elevators 4 Configurations Present 1 BHK
Flats Per Floor 8 Tower Layout
Wing Name A wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts --
Wing Name B wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 29
Number of Plinth 1 Number of Stilts --
Wing Name C wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 28
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 31-12-2024
Possession Availability as per RERA
Proposed Date of Completion 30-12-2025
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth 1
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 34
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --