1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Wing - A Fire Exits --
Total Floors 14 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK,3 BHK
Flats Per Floor 6 Tower Layout
Wing Name Wing - A Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Wing - B Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Wing - C Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts 1
Wing Name Wing - D Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2020
Possession Availability as per RERA
Proposed Date of Completion 31-12-2018
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 70
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --