Dedicated locality research platform

1st Habitable Floor

5th

Views
--
Floor to Ceiling Height

--

Project Theme

Gated Community

Tower Name Grandness Fire Exits 3
Total Floors 23 Refuge Areas 7
Number of Elevators 6 Configurations Present 1 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Grandness Fire Exits 3
Total Floors 23 Refuge Areas 7
Number of Elevators 6 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Wing Name Grandness Number of Podium 3
Number of Basements 1 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2021
Possession Availability as per RERA
Proposed Date of Completion 30-06-2022
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 44
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
Business & Hospitality
  • ATM / Bank Attached
Security & Sanitation
  • Security System / CCTV
  • Intercom Facility
Green Features
  • Water Storage
© Propscience.com. All Rights Reserved.