Dedicated locality research platform

1st Habitable Floor

1st Floor

Views
--
Floor to Ceiling Height

--

Project Theme

Eastern Creak

Tower Name Tower A Fire Exits 2
Total Floors 36 Refuge Areas 5
Number of Elevators 4 Configurations Present 3 BHK,4 BHK,Penthouse
Flats Per Floor 3 Tower Layout View Layout
Wing Name Tower A Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 38
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2022
Possession Availability as per RERA
Proposed Date of Completion 31-12-2017
Revised Proposed Date of Completion 30-06-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 65
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 30
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 4
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 4
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 4
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.