Dedicated locality research platform

1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name B Wing Fire Exits --
Total Floors 12 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK
Flats Per Floor 4 Tower Layout
Wing Name Casa Bellisimo B wing Number of Podium 1
Number of Basements -- Number of Slabs of Superstructure 12
Number of Plinth 1 Number of Stilts 2
Possession Availability
Possession Date 31/10/2019
Possession Availability as per RERA
Proposed Date of Completion 30-04-2019
Revised Proposed Date of Completion 31-10-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 80
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 90
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 90
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.