Dedicated locality research platform

1st Habitable Floor

9 th floor

Views
Water Body / City Skyline
Floor to Ceiling Height

Greater than 10 feet

Project Theme

Mahalaxmi Race Course, Sea View, Mumbai Central, Rani Baug v ...

Tower Name Monte South Phase 2 Fire Exits 2
Total Floors 63 Refuge Areas 3
Number of Elevators 9 Configurations Present 2 BHK,2.5 BHK,3 BHK,3.5 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name MONTESOUTH TITLIS-2 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth -- Number of Stilts --
Possession Availability
Possession Date 31-12-2021
Possession Availability as per RERA
Proposed Date of Completion 31-12-2021
Revised Proposed Date of Completion 30-12-2022
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 87
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 12
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 3
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.