Dedicated locality research platform

1st Habitable Floor

Ist Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name Promenade 1 Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Promenade 2 Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Promenade 3 Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Tower Name Promenade 4 Fire Exits --
Total Floors 22 Refuge Areas --
Number of Elevators 4 Configurations Present 2 BHK
Flats Per Floor 8 Tower Layout View Layout
Wing Name Promenade 1 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Promenade 2 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Promenade 3 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Wing Name Promenade 4 Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31-12-2019
Possession Availability as per RERA
Proposed Date of Completion 31-03-2017
Revised Proposed Date of Completion 31-12-2019
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 100
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 100
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 100
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate 100
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.