Dedicated locality research platform

1st Habitable Floor

2nd Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

NA

Tower Name The Trees, Origins - P Fire Exits 1
Total Floors 10 Refuge Areas 1
Number of Elevators 1 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name The Trees, Origins - Q Fire Exits 1
Total Floors 13 Refuge Areas 1
Number of Elevators 1 Configurations Present 1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name The Trees, Origins - R Fire Exits 1
Total Floors 13 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Origins - S Fire Exits 1
Total Floors 17 Refuge Areas 1
Number of Elevators 2 Configurations Present 1 BHK,2 BHK,3 BHK,Penthouse
Flats Per Floor 4 Tower Layout
Tower Name The Trees, Origins - T Fire Exits 1
Total Floors 17 Refuge Areas 1
Number of Elevators 2 Configurations Present 2 BHK,3 BHK,4 BHK
Flats Per Floor 4 Tower Layout
Wing Name P Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 10
Number of Plinth 1 Number of Stilts 1
Wing Name Q Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name R Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 13
Number of Plinth 1 Number of Stilts 1
Wing Name S Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Wing Name T Number of Podium --
Number of Basements 2 Number of Slabs of Superstructure 17
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-06-2022
Possession Availability as per RERA
Proposed Date of Completion 30-06-2022
Revised Proposed Date of Completion 30-06-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 93
1 X Number Of Podiums --
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 40
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 21
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.