test

Dedicated locality research platform

test
1st Habitable Floor

4th Floor

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Greater than 10 feet

Project Theme

NA

Tower Name Wing A Fire Exits --
Total Floors 20 Refuge Areas --
Number of Elevators 2 Configurations Present 3 BHK
Flats Per Floor 1 Tower Layout View Layout
Tower Name Wing B Fire Exits --
Total Floors 20 Refuge Areas --
Number of Elevators 5 Configurations Present 2 BHK,3 BHK
Flats Per Floor 5 Tower Layout View Layout
Tower Name Wing C Fire Exits --
Total Floors 20 Refuge Areas --
Number of Elevators 5 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing D Fire Exits --
Total Floors 20 Refuge Areas --
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 5 Tower Layout View Layout
Wing Name Tridhaatu Aum Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 30-12-2023
Possession Availability as per RERA
Proposed Date of Completion 08-07-2012
Revised Proposed Date of Completion 30-12-2023
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 80
1 X Number Of Podiums 50
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 60
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 30
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 30
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /crz Noc, Finishing To Entrance Lobby/s, Plinth Protection, Paving Of Areas Appurtenant To Building/wing, Compound Wall And All Other Requirements As May Be Required To Obtain Occupation /completion Certificate --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.