1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Wing A Fire Exits --
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK,1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing B Fire Exits --
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK,1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing C Fire Exits --
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 3 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing D Fire Exits --
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK,1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Tower Name Wing E Fire Exits --
Total Floors 23 Refuge Areas --
Number of Elevators 2 Configurations Present 1.5 BHK,1 BHK,2 BHK
Flats Per Floor 4 Tower Layout View Layout
Wing Name Sale building no 1 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 4
Number of Plinth 1 Number of Stilts 1
Wing Name Building 3 Rehab Parampujya Dr Babasaheb Ambedkar Nagar SRA CHS Ltd A to D Wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 19
Number of Plinth 1 Number of Stilts 1
Wing Name Building no 4 Rehab Parampujya Dr Babasaheb Ambedkar Nagar SRA CHS Ltd A Wing Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 21
Number of Plinth 1 Number of Stilts 1
Wing Name ANUTHAM A, B, D,E WING ,C WING-VEENA Number of Podium 5
Number of Basements -- Number of Slabs of Superstructure 24
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date
Possession Availability as per RERA
Proposed Date of Completion 31-12-2019
Revised Proposed Date of Completion 30-11-2020
Sr. No Task/Activity % Work Done
1 Excavation --
1 X Number Of Basement(s) And Plinth --
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure --
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More