Dedicated locality research platform

1st Habitable Floor

--

Views
--
Floor to Ceiling Height

--

Project Theme

--

Tower Name Wing A Fire Exits --
Total Floors 20 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Tower Name Wing B Fire Exits --
Total Floors 20 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 4 Tower Layout
Wing Name Jyoti Sukriti Bldg No 4 Number of Podium 2
Number of Basements -- Number of Slabs of Superstructure 20
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2020
Possession Availability as per RERA
Proposed Date of Completion 31-12-2020
Revised Proposed Date of Completion 30-06-2021
Sr. No Task/Activity % Work Done
1 Excavation 85
1 X Number Of Basement(s) And Plinth 85
1 X Number Of Podiums 80
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 69
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises 46
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 100
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 75
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 17
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.