1st Habitable Floor

1st Floor

Views
Road View / No View
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

--

Tower Name Wing B Fire Exits --
Total Floors 14 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 2 Tower Layout View Layout
Tower Name Wing A Fire Exits --
Total Floors 14 Refuge Areas --
Number of Elevators 2 Configurations Present 2 BHK,3 BHK
Flats Per Floor 2 Tower Layout View Layout
Wing Name WING A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name WING B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 14
Number of Plinth 1 Number of Stilts 1
Wing Name WING C Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 16
Number of Plinth 1 Number of Stilts 1
Possession Availability
Possession Date 31/12/2021
Possession Availability as per RERA
Proposed Date of Completion 31-12-2021
Revised Proposed Date of Completion 30-12-2022
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums 100
1 Stilt Floor 100
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises 80
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. 95
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing 90
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr 50