Dedicated locality research platform

1st Habitable Floor

1st

Views
Open Grounds / Landscape / Project Amenities
Floor to Ceiling Height

Between 9 and 10 feet

Project Theme

50% lower maintenance*,Ample greenery with 1200+ trees

Tower Name Tower 3 / Tower 4 Fire Exits 1
Total Floors 15 Refuge Areas 2
Number of Elevators 3 Configurations Present 1 BHK
Flats Per Floor 6 Tower Layout
Tower Name Tower 5 A Wing/B Wing Fire Exits 1
Total Floors 15 Refuge Areas 2
Number of Elevators 3 Configurations Present 1 BHK,2 BHK
Flats Per Floor 6 Tower Layout
Tower Name Tower 7 Fire Exits 2
Total Floors 23 Refuge Areas 3
Number of Elevators 3 Configurations Present 2 BHK
Flats Per Floor 6 Tower Layout
Wing Name Tower 1 Commercial Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 1
Number of Plinth 1 Number of Stilts --
Wing Name Tower 2 Commercial Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 1
Number of Plinth 1 Number of Stilts --
Wing Name Tower 3 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts --
Wing Name Tower 4 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts --
Wing Name Tower 5 Wing A Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts --
Wing Name Tower 5 Wing B Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 15
Number of Plinth 1 Number of Stilts --
Wing Name Tower 7 Number of Podium --
Number of Basements -- Number of Slabs of Superstructure 23
Number of Plinth 1 Number of Stilts --
Possession Availability
Possession Date 30/06/2024
Possession Availability as per RERA
Proposed Date of Completion 30-06-2025
Revised Proposed Date of Completion N/A
Sr. No Task/Activity % Work Done
1 Excavation 100
1 X Number Of Basement(s) And Plinth 100
1 X Number Of Podiums --
1 Stilt Floor --
1 X Number Of Slabs Of Super Structure 100
1 Internal Walls, Internal Plaster, Floorings Within Flats/premises, Doors And Windows To Each Of The Flat/premises --
1 Sanitary Fittings Within The Flat/premises,electrical Fittings Within The Flat/premises --
1 Staircases, Lifts Wells And Lobbies At Each Floor Level Connecting Staircases And Lifts, Overhead And Underground Water Tanks. --
1 The External Plumbing And External Plaster, Elevation, Completion Of Terraces With Waterproofing Of The Building/wing --
1 Installation Of Lifts, Water Pumps, Fire Fighting Fittings And Equipment As Per Cfo Noc, Electrical Fittings To Common Areas, Electro, Mechanical Equipment, Compliance To Conditions Of Environment /cr --
View More
View Less
Amenities
© Propscience.com. All Rights Reserved.